Restoration of 3.5 Kwp OFF Grid Solar Power Plant Installed at Kodikkarai Lighthouse under Chennai Directorate
Restoration of 3.5 Kwp OFF Grid Solar Power Plant Installed at Kodikkarai Lighthouse under Chennai DirectorateDate of Opening Bid29/05/2024Tender Date13/05/2024 - 28/05/2024Extended Start DateReference NumberMDS-01003(06)/1/2021-MNT-MD
Download(784.88 KB)
Download(784.88 KB)