Archived Tenders
Sr. No. | Title | Directorate | Start & End Date | Date of Opening BID | Download | Corrigendum |
---|---|---|---|---|---|---|
21 | Replacement of existing Storm Signal Mast by new one at Puri Storm Signal Centre, Odisha. | Kolkata | 21/08/2024 - 05/09/2024 | 06/09/2024 | Download(378.72 KB) | |
22 | Painting to RCC Lighthouse Tower and GI Trestle tower at Paradip Lighthouse & DGPS Station | Kolkata | 19/08/2024 - 07/09/2024 | 09/09/2024 | Download(361.8 KB) | |
23 | Supply and Installation of ON Grid and OFF Grid Solar Inverter at various Lighthouses under Kolkata Directorate. | Kolkata | 21/08/2024 - 05/09/2024 | 06/09/2024 | Download(372.6 KB) | |
24 | Work Contract for issuing tickets and Regulating visitors at Lighthouse stations under Chennai Directorate for the period from 01.09.2024 to 31.03.2025. | Chennai | 14/08/2024 - 23/08/2024 | 26/08/2024 | Download(547.29 KB) | |
25 | Conducting Technical cum Commercial Feasibility Study for installation of Lift at Poompuhar, Kodikkarai, Nagapattinam, Mallipattinam and Kilakkarai Lighthouses. | Chennai | 08/08/2024 - 29/08/2024 | 30/08/2024 | Download(144.45 KB) | |
26 | Conducting Technical cum Commercial Feasibility Study for installation of Lift at Poompuhar, Kodikkarai, Nagapattinam, Mallipattinam and Kilakkarai Lighthouses. | Chennai | 30/05/2024 - 29/07/2024 | 30/07/2024 | Feasibilitystudycancellation.pdf (79.19 KB) | |
27 | Special Civil Maintenance to Lighthouse Tower and allied buildings including improvement of Internal Roads/Pathways and provision of Bio-toilets at Kuthenkuli Lighthouse in Chennai Directorate. | Chennai | 08/08/2024 - 29/08/2024 | 30/08/2024 | Download(860.19 KB) | |
28 | Special repairs and civil maintenance of Lighthouse tower, allied buildings and compound wall etc. at Ammapattinam Lighthouse station. | Chennai | 08/08/2024 - 29/08/2024 | 30/08/2024 | Download(1.03 MB) | |
29 | Special Repair and Civil Maintenance of Lighthouse Tower, Compound wall etc. at Karaikal Lighthouse. | Chennai | 11/07/2024 - 19/08/2024 | 20/08/2024 | EXTKaraikalCM24II.pdf (664.52 KB) | |
30 | Special Repairs and civil maintenance to the Lighthouse tower, allied buildings and compound wall and increasing the height of compound wall at Passipattinam Lighthouse. | Chennai | 09/07/2024 - 19/08/2024 | 20/08/2024 | EXTPassiCM24II.pdf (476.3 KB) | |
31 | Civil maintenance and Repairs to the Lighthouse Tower, staff quarters compound wall etc., at Olakuda Rameswaram. | Chennai | 30/07/2024 - 20/08/2024 | 21/08/2024 | Download(343.87 KB) | |
32 | Demolition & disposal of damaged old Lighthouse tower of Kiltan (N) Lighthouse, UT of Lakshadweep | Kochi | 27/07/2024 - 06/08/2024 | 07/08/2024 | Download(1.47 MB) | |
33 | Special Repair and Civil Maintenance of Lighthouse Tower, Compound wall etc. at Karaikal Lighthouse. | Chennai | 11/07/2024 - 05/08/2024 | 06/08/2024 | EXTKaraikalCM24_0.pdf (102.62 KB) | |
34 | Conducting Technical cum Commercial Feasibility Study for installation of Lift at Poompuhar, Kodikkarai, Nagapattinam, Mallipattinam and Kilakkarai Lighthouses. | Chennai | 12/07/2024 - 29/07/2024 | 30/07/2024 | TechCorrigendumFeasibilitystudyII.pdf (302.97 KB) | |
35 | Design, Supply, Installation, Testing and Commissioning of 01 number, 10 passengers (680Kg) machine room less Lift with SS Glass Cabin at Puducherry DGNSS Station. | Chennai | 08/07/2024 - 13/08/2024 | 14/08/2024 | EXTPuducherrylift.pdf (86.16 KB) | |
36 | Engagement of Independent Engineer for the project - Development of tourism at Mahabalipuram Lighthouse on PPP basis. | Chennai | 13/05/2024 - 30/07/2024 | 31/07/2024 | EXTIndeEngineerIV.pdf (638.63 KB) | |
37 | Modification work to the Lighthouse Tower at Azhikod Lighthouse & DGNSS Station | Kochi | 22/07/2024 - 21/08/2024 | 23/08/2024 | Download(865.44 KB) | |
38 | Special Repairs and civil maintenance to the Lighthouse tower, allied buildings and compound wall and increasing the height of compound wall at Passipattinam Lighthouse. | Chennai | 09/07/2024 - 05/08/2024 | 06/08/2024 | EXTPassiCM24.pdf (642.47 KB) | |
39 | Fabrication, Supply, Installation and Commissioning of LTCT Panel, Fuse Panel and Distribution Panelfor Augmentation of power supply to Static Sensors phase II at Pulicat, Portonova and Nagapatinam lighthouses under Chennai Directorate | Chennai | 22/07/2024 - 05/08/2024 | 22/07/2024 | Download(153.65 KB) | |
40 | Design, Supply, Installation, testing and commissioning of 01 number, 13 passengers (884 Kg) machine room less Lift with SS Glass Cabin at Pulicat DGNSS Station. | Chennai | 16/07/2024 - 07/08/2024 | 08/08/2024 | Download(348.96 KB) |